Working Bee – Saturday 22nd April
Hey there everyone! We hope you all had a great Easter break.
We are holding a track working bee for this Saturday the 22nd from 8.30am and we NEED YOUR HELP!
There’s a bit if a job ahead
We will be installing a drain pipe into 3X Tables so that the water can drain that part of the track, and there’s a big low spot before the big berm that needs filling in.
Please bring a spades and a rake, maybe even a wheelbarrow if you can. So if we get enough hands we’ll only be a couple of hours.
Many Thanks. The track team!